We shall interpret this task in terms of graph theory. The structure of the power plant becomes a tree, and the bases of the power plant become the vertices of the tree.
Subtask 1
Since the tree has a small number of vertices, we can try all possibilities of the status (ON
/OFF
) of the power
generators' switches. Choose a vertex of a power generator whose status is ON
, and consider a rooted tree
whose root is the chosen vertex. By the depth-first search (DFS), we can calculate the profit in time.
Therefore, the total time complexity of this algorithm is
.
Since , we may calculate the profit using a slower algorithm which takes
or
time.
Subtask 1 (Another solution)
We consider the minimum subtree which contains all the power generators which are finally activated or broken. In such a subtree, all the leaves are activated power generators, and all power generators which are not leaves are broken. Therefore, considering all subtrees for which all leaves are power generators, we can solve this task by calculating the maximum of
Subtask 2
We fix a power generator whose status will be ON
, and consider the problem of maximizing the profit when
we turn the switch of the fixed power generator to ON
. We consider the rooted tree whose root is the vertex
of the fixed power generator. Then, a power generator other than the root is broken if and only if its descendants
contain a power generator whose switch is ON
. We may think that this task can be solved by dynamic
programming.
For each vertex , consider the subtree consisting of
and its descendants, and let
be the maximum of
in the subtree when we choose the status (ON
/OFF
) of every power generator in the subtree. We calculate the
value of by updating the values from the leaves successively.
Let us consider how to update the value of . For each vertex
, let
be the number of power generators
at
(
). As explained above, when we determine the status of
, we consider the case where the
descendants contain a power generator whose status is
ON
and the case where the descendants do not contain
such a power generator, separately.
(The case where the descendants of
do not contain a power generator whose status is
ON
)In this case, the status of every descendant of
is
OFF
. If there is a power generator at, we should turn its switch to
ON
. Therefore, the maximum value ofis
.
(The case where the descendants of
may contain a power generator whose status is
ON
)Since we can freely choose the status (
ON
/OFF
) of the descendants of, we will calculate the sum of
's of the descendants of the children of
. But, if there is a power generator at
, it will be broken.
Summarizing these two cases, we have the following recurrence formula:
We shall calculate the values of by the depth-first search (DFS). Note that, at the root vertex, even if one
child or the descendants of one child contain a power generator whose status is
ON
, the power generator at the
root vertex will not be broken.
By the above algorithm, when we fix a power generator whose status will be ON
, we can calculate the
maximum of the profit in time. Therefore, considering all choices of a fixed power generator, the original
problem will be solved in
time.
Subtask 3 (Full score solution)
In the algorithm of Solution 2, we consider the rooted tree whose root is the fixed power generator whose
status will be ON
. We can calculate the value of at a vertex since we can decide whether the power generator
at the vertex is broken or not using the information of its descendants only. In the following full score solution,
we will also calculate the values of
by considering a rooted tree. For each vertex, assuming there is a power
generator whose status is
ON
outside the subtree consisting of its descendants, we will calculate the maximum
of the profit when we choose the status (ON
/OFF
) of the subtree.
In order to calculate the maximum value completely, we consider the minimum subtree which contains all
the power generators which are finally activated or broken. For each vertex , we shall calculate the maximum
value for the minimum subtree where the vertex closest to the root is
. If we can calculate this value for every
vertex, we can solve the task.
Let us consider the calculate for the vertex .
(The case where there is a power generator at the vertex
, and it will be activated)
In this case, we can freely choose the status (
ON
/OFF
) of a vertex in the subtree of one child only. The status of every vertex in the subtrees of other children should beOFF
. Therefore, we shall calculate(The case where there is a power generator at the vertex
, and it may be broken)
In this case, we can freely choose the status (
ON
/OFF
) of a vertex of the descendants. We will calculate the sum ofof the children of
. Assuming the power generator at
will be broken, we calculate
(The case where there is no power generator at the vertex
)
Similarly, since we can freely choose the status (
ON
/OFF
) of a vertex of the descendants, we calculate
Summarizing, for each vertex ,
- if
, we calculate
- if
, we calculate
Then the maximum of these values will be the answer.
By the above algorithm, the answer can be calculated in time.